<div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">Baldi</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><ol><li>Replacement sectors / hardware to upgrade to dual band (I have all the hardware now)</li><li>Replacement NetMetal / Dish to replace Beacon.Baldi PtP, if in fact it is needed to bring this link back online. (I have the netmetal and will work out the dish with Doug)</li><li>ToDo: Re-IP the three sectors and move off the 44.24.240.x subnet (I will do this when configuring the sectors prior to installation)</li><ol><li>Depending on how many static IP / links have been set up on the sectors, I might need some help here. </li></ol></ol><div>ETiger</div><div><ol><li>Get approval again from Rich-KF7BJI to install the 60Ghz link hardware and HamWAN router in the Silke building</li><ol><li>Install 60Ghz radio/antenna on Silke tower (I am hoping it will fit on the same mount as the POV camera)</li><li>Run new Cat5e cable (the cable run and mounts are already installed when I remounted the camera several years ago)</li><li>Install the HamWAN router in the rack, create link to Silke router and move the POV camera over to HamWAN router</li></ol><li>Get approval again from PSRRG to install the other end of the 60Ghz link at the main site</li><ol><li>Will require installing the 60Ghz antenna/radio on tower (A spot was identified a couple years ago, hoping still available)</li><li>Install cat5 mounts, since they didn't seem to be installed previously and run new cat5 into hut</li><li>possibly shift around devices on R1.etiger to open up port for new radio</li></ol></ol><div>I am guessing doing #2 first makes more sense and then completing #1. Probably the biggest challenge is lining up the approvals again (was originally all done pre-Covid and pre-DNR mess). Besides getting the ETiger camera back, the on other long term benefit is being able to add another PtP to the Silke tower and/or another sector.(I am now leaning to another PtP link if a target can be identified, like Buck?)</div></div><div><br></div><div>Buck - I completely forgot about this one in my original e-mail...</div><div><ol><li>biological interference maintenance / removal</li><li>Move the now dead Gold.Buck PtP to point to another site and re-enable a second link into the site.</li><li>Anything else Rob?</li></ol><div><br></div></div><div>Thanks</div><div>Kenny</div></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Mon, Mar 20, 2023 at 11:52 AM Rob Salsgiver <<a href="mailto:rob@nr3o.com">rob@nr3o.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div class="msg-7845083818542922189"><div lang="EN-US"><div class="m_-7845083818542922189WordSection1"><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,"sans-serif";color:rgb(31,73,125)">What do you need for both sites Kenny?  If we can get a list together we can see what is needed that we don’t already have and get it ordered.  Lead times are my biggest concern here. <u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,"sans-serif";color:rgb(31,73,125)"><u></u> <u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,"sans-serif";color:rgb(31,73,125)">Rob<u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:11pt;font-family:Calibri,"sans-serif";color:rgb(31,73,125)"><u></u> <u></u></span></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:Tahoma,"sans-serif"">From:</span></b><span style="font-size:10pt;font-family:Tahoma,"sans-serif""> Kenny Richards [mailto:<a href="mailto:richark@gmail.com" target="_blank">richark@gmail.com</a>] <br><b>Sent:</b> Monday, March 20, 2023 9:48 AM<br><b>To:</b> Puget Sound Data Ring<br><b>Cc:</b> <a href="mailto:netops@hamwan.org" target="_blank">netops@hamwan.org</a>; Rob Salsgiver<br><b>Subject:</b> Re: [HamWAN PSDR] 2023 HamWAN season projects - INPUT NEEDED!<u></u><u></u></span></p><p class="MsoNormal"><u></u> <u></u></p><div><div><div><p class="MsoNormal"><span style="font-family:Arial,"sans-serif"">While #1 (Baldi) is at the top of my list to get done this year, I'd also like to make some progress on ETiger if I can line up the approvals. Specifically I'd like to put in a 60Ghz link between the two buildings (removing the need for using a sector), add a HamWAN router to the second building and finally fix the camera. I think the ETiger camera was one of the most popular for people outside of HamWAN.<u></u><u></u></span></p></div><div><p class="MsoNormal"><span style="font-family:Arial,"sans-serif""><u></u> <u></u></span></p></div><div><p class="MsoNormal"><span style="font-family:Arial,"sans-serif"">Thanks<u></u><u></u></span></p></div><div><p class="MsoNormal"><span style="font-family:Arial,"sans-serif"">Kenny<u></u><u></u></span></p></div></div><p class="MsoNormal"><u></u> <u></u></p><div><div><p class="MsoNormal">On Fri, Mar 17, 2023 at 8:09 PM Rob Salsgiver <<a href="mailto:rob@nr3o.com" target="_blank">rob@nr3o.com</a>> wrote:<u></u><u></u></p></div><blockquote style="border-top:none;border-right:none;border-bottom:none;border-left:1pt solid rgb(204,204,204);padding:0in 0in 0in 6pt;margin-left:4.8pt;margin-right:0in"><div><div><div><p class="MsoNormal">Good evening all,<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">It’s that time of year again where we need to start putting together the list of projects to try to accomplish for the year. <u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">I would like to get input from anyone who has a project they would like to see accomplished this year.  Priority focus will be on those items requiring mountain top access as those are our most time or weather sensitive items.<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">Below is a starting list of projects I know at least bits about:<u></u><u></u></p><p class="m_-7845083818542922189m6430229245694682971msolistparagraph">1)<span style="font-size:7pt">      </span>Baldi visit – upgrade sectors to MIMO and/or PTP work(?)<u></u><u></u></p><p class="m_-7845083818542922189m6430229245694682971msolistparagraph">2)<span style="font-size:7pt">      </span>Lookout visit – effect repairs on Lookout/SnoDEM PTP dish (likely cable fault)<u></u><u></u></p><p class="m_-7845083818542922189m6430229245694682971msolistparagraph">3)<span style="font-size:7pt">      </span>Indianola setup – in process / being finished by Doug and others<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">What else?  As mentioned, it doesn’t need to be a site/tower project, but those are the primary focus during good weather.<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">Let me know and I’ll get it on the list so we can try to gather and coordinate resources as needed.<u></u><u></u></p><p class="MsoNormal"> <u></u><u></u></p><p class="MsoNormal">Cheers,<u></u><u></u></p><p class="MsoNormal">Rob Salsgiver – NR3O<u></u><u></u></p></div></div><p class="MsoNormal">_______________________________________________<br>PSDR mailing list<br><a href="mailto:PSDR@hamwan.org" target="_blank">PSDR@hamwan.org</a><br><a href="https://mail01.fmt.hamwan.net/mailman/listinfo/psdr" target="_blank">https://mail01.fmt.hamwan.net/mailman/listinfo/psdr</a><u></u><u></u></p></div></blockquote></div></div></div></div></div></blockquote></div>