[HamWAN PSDR] Haystack work party
Tom Hayward
tom at tomh.us
Mon Apr 9 12:49:27 PDT 2018
Haystack-S1 and Haystack-S3 have been down for most of the winter. Bart has
traditionally maintained this site, but has indicated that he does not have
time to make a trip to replace them. The current impediments are snow on
the road and willing and able volunteers. Bart can arrange for access
(keys) to the site. HamWAN is looking for:
1) A project manager to coordinate this project
2a) Volunteers capable of snow travel
2b) Or, wait until the road thaws out, any volunteers capable of standing
on a ladder and swapping out a modem/antenna
Tom
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mail.hamwan.net/pipermail/psdr/attachments/20180409/168048d0/attachment.html>
More information about the PSDR
mailing list